Pool Closure
Scheduled Maintenance
- 8 AM to 9 PM, Wednesday, May 20
Wednesday, May 20 will begin maintenance repair work on the pool area HVAC system, including installing new equipment on top of the building. As a result, the east side of the parking lot will be closed for large maintenance vehicles (and a crane) to safely maneuver. The entire pool deck area will also be closed for the day beginning at 8 am. The HVAC system will be off during repairs.
Impacted Areas to be Closed
- All pools
- Hot tub
- Steam Room
- East side of the parking lot
Overflow parking available behind the rec center or on public streets.
