Skip to main content

Pool Closure

Scheduled Maintenance

  • 8 AM to 9 PM, Wednesday, May 20

Wednesday, May 20 will begin maintenance repair work on the pool area HVAC system, including installing new equipment on top of the building. As a result, the east side of the parking lot will be closed for large maintenance vehicles (and a crane) to safely maneuver. The entire pool deck area will also be closed for the day beginning at 8 am. The HVAC system will be off during repairs. 

Impacted Areas to be Closed

  • All pools
  • Hot tub
  • Steam Room
  • East side of the parking lot

Overflow parking available behind the rec center or on public streets. 

Join our mailing list